Inspection that follows the project specification.
QUALITY ASSURANCE

Inspection that follows the project specification.

Requirements, checkpoints, records and final release are connected throughout the order.

01

Standard review

Applicable IEC, IEEE, ANSI or regional requirements are confirmed at proposal stage.

02

Documented checkpoints

Materials, assembly, routine testing and accessories follow the agreed inspection plan.

03

Release package

Test records, drawings, packing lists and agreed project documents support handover.

INSPECTION FLOW

Quality is checked before it becomes a shipping problem.

01Design input review
02Incoming material check
03Process inspection
04Routine electrical tests
05Visual & dimensional check
06Packing release
PROJECT COMPLIANCE

Standards are selected by product and destination.

Certification and conformity documents are published only after verification for the relevant product and project.

IEC 60076Power transformer series
IEC 60076-11Dry-type transformers
IEC 62271High-voltage switchgear and substations
IEEE / ANSIRegional utility configurations
SANS / SONCAPDestination-specific review where required
Project FATAgreed inspection and witness plan